Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations Toost on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. BoltedFault

    Cable Fill Ratio-NEC

    Thanks for the responses. I suspected the fill ratio limitation had to do with heat dissipation, however I wanted to confirm it. I couldn't find the info anywhere, and I didn't want to accept something without knowing the reasoning behind it.
  2. BoltedFault

    Cable Fill Ratio-NEC

    I have a question regarding the NEC and the conduit fill ratio. The NEC recommends the cable fill ratio remains under 40% for two or more cables. What is the reasoning to limit the allowable fill ratio to 40%? What problems could occur if the 40% fill ratio is exceeded?
  3. BoltedFault

    Voltage Drop Formula

    Thanks for the responses and help. The information you all have provided has been helpful and confirmed what I found.
  4. BoltedFault

    Voltage Drop Formula

    Thanks for the responses so far. The Mike Holt spreadsheets are informative but do not fully apply to my situation (limited due to the voltage level). The voltage is 34500 (phase-to-phase). The assumed PF is 0.9. I was at the proposed site today and the length of the cable run is...
  5. BoltedFault

    Voltage Drop Formula

    I'm a fairly new engineer working for the local power company. I have been tasked with sizing an underground run for a mobile substation. Unfortunately, I didn't have any power courses in college, so I have spent some time researching equations. Can anyone provide a website or an equation to...

Part and Inventory Search