The fire wall separates the units. There are no structural members bearing on the top of the wall. The sheathing from the roofs on either side come to a peak at the mid line of the beam.
I understand your recommendation regarding the the embedded supports. But what I am really after is how...
Issue: Specifying a poured concrete beam between dwelling units while maintaining the fire separation.
Construction: CMU with wood truss roof system. Two story building.
Condition: A portion of the poured beam is horizontal and the peak of the roof system is in the center of the beam, when...