This work is probably already complete so it would be interesting how it turned out.
One of the other responses already mentioned why is it so humid in the space now. If the room conditions is measured at 72F/61%, and you are supplying 55F/54F, you are gaining 13 grains/lbair across the space...
Thanks cry22 but this is not what I am looking for.
EQ Credit 7.1 intent is to provide a comfortable thermal environment the supports productivitiy and well being of the building occupants. In order to acheive this credit, the building envelope and HVAC systems need to meet the requirements of...
Has anyone applied and successfully received the point for Leed EQ Credit 7.1 Thermal Comfort in a large facility which is mainly sheet metal welding and part assembly?
Typical facilities do not need to be cooled to office conditions but tempered 5 to 10 degrees below ambient outside conditions...
11echo:
Thanks for your response.
Have you ever used the Flexitallic type CG when connecting the 150# steel pipe flange to the 125# cast iron valve flange?
If you have did you have any problem with stressing the cast iron?
In a natural gas medium pressure aboveground piping system, what type and material of gaskets have others used between a 125# cast iron valve flange and 150# steel pipe flange with the raised portion machined down?
Has anyone successfully used a spiral wound metal gasket?