Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. wollundry5

    Rockfill Dam and Anchors

    Our company is a major electricity supplier located in Australia. One of our dams is a 93 m high Concrete Face Rockfill Dam. The slope of the downstream face of the dam is 1V : 1.3 H (38 degrees). The dam was constructed during the early 1980's and now the spillway has been deemed to have...
  2. wollundry5

    Use of Aggregates Containg Sulphides for Unreinforced Roller Compacted

    We are rehabilitating a dam by using unreinforced Roller Compacted Concrete. The problem is that the dam is located in a very remote area and lacks commerically available aggregate and would be cost prohibitive to bring this material to site.There are local sources of rockfill (rhyolite and...
  3. wollundry5

    Concrete Corrossion from Aggregates Containing Sulphides

    We are rehabilitating a dam by using unreinforced Roller Compacted Concrete. The problem is that the dam is located in a very remote area and the local sorce of rockfill (rhyolite and granite)used on the original dam contains some sulphide mineralisation. Would this rock be suitable for a...
Back
Top