Hi,
you can contact Deltek or Foster Wheeler. Since the 9E has 385-407 kg/s mass flow in the HRSG, if it trips, you will need a very large draft fan to do the work from a bye-pass system, that may not be economical. Unless you need large amount of steam from the HRSG if otherwise, the steam for...
Hi,
if you are talking about 3mmbtu, I assume it is the LNG flow capacity, per second or per hour. LNG LHV is around 880900btu/scf, which is 3,000,000/880~900.
Depending on the flame terperature, to determind the amount of excess air require, for example 1720K, the excess air would be 137%, the...