  1. moeedalam01

    ASME U & R Stamp Scopes

    Also, I discussed with my colleagues that if non-pressure parts (such as platform cleats etc.) of a column or pressure vessel require repairs..... will we need to have an R Stamp for repairs or not?
  2. moeedalam01

    ASME U & R Stamp Scopes

    Thanks metengr.... What would be a preferred solution for my problem...???
  3. moeedalam01

    ASME U & R Stamp Scopes

    We have been working on a project of designing of a 250 MMSCFD Gas Processing Plant.....the plant has various process units such as Amine Unit, Dehydration Unit, LPG Recovery Unit etc. We have procured Amine Absorber Column which is now on site. The Column is designed and fabricated as per ASME...
  4. moeedalam01

    Wellhead Piping (Downstream of Choke Valve)

    I am currently working on a project that includes gathering of 30 nos. oil / gas wells in plant manifolds and then setting up a gas processing plant which removes CO2 from the stream vide Amine Sweetening Unit Along with Mol Sieve Unit for removal of water. Condensate and LPG is extracted also...