New to MSE (reinforced soil). Engineers are looking at options for slope stabilization and one is a reinforced slope using reinforced soil, perimeter drain, and TMA turf reinforcement mat. As I understand it, reinforced soil has geosynthetics in it. About how much does MSE (reinforced soil) go...
We have a one line of a 2x1 Plant (2 GTGS and 1 STG) where two Auxiliary transformers are fed from a tapbox from the GTG trains to a MV switchgear. What would be the benefit of adding a third auxiliary transformer in this case and tying into the MV switchgear? Wouldn't there be a benefit had it...