Search results for query: *

  1. haripals

    Calculation of Fire Case Relief Requirement for TEG Gas Contactor

    We have installed Inergen gas system for control room and instrument equipment room in Offshore platorm. The control panel and actuators are non explosion proof, but exlosion proof required. Control panels are located in non-hazardous area. Could anyone suggest how to resolve this. Thanks
  2. haripals

    GRP Firewater Pipe System?

    GRP manufacturer / supplier can be consulted if the pipe listed to withstand a two hour fire rating or not in a dry system. Because GRP/FRP pipework properties varies from manufacturer to manufacturer. or the supplier can be requested for suitable treatment to supplied piping to meet projct...