  1. mustafa2014

    Vibration on Air Atlas Copco compressor

    Dears All good day, we have Atlas air compressor ZR 500 , the second stage has quit high vibration as per attached report, could these compressor go in high vibration , is the readings in the report accepted...
  2. mustafa2014

    Process design

    What i mean here if the plant totally shut down
  3. mustafa2014

    Process design

    Dears thanks for your replies, We have to blow down the gas to the plant flaers. Thai is the company rule. what i mean it is not possible here as stated in country regulation to burn the gas more the 10 hours in order to avoid the emission to the area. Now it takes more then 12 hours to burnt...
  4. mustafa2014

    Process design

    Dear all , Good day I would like to ask about some issues & if it could be solved. We here in gas plant consist of three trains SRU & SWEET GAS. We suffering when one of trains or the three trains went shut down, we have to burn all the gases coming from the platform which about 120 km from...
  5. mustafa2014

    Service life of fixed, internal & external floating roofs

    Thank you very much for all your replies. Mr.IFRs the tank i have seen it is fixed conical roof. the tank is for gas oil storage.
  6. mustafa2014

    Service life of fixed, internal & external floating roofs

    Dear All, Good day, I would like to know how much is the lifetime of the API storage tanks roofs(is there any thing related to that in API?). Actually, i saw a fixed conical roof built in 1979 before two days. Some of supporters underneath the roof has been bulked & bended. Is that mean the...
  7. mustafa2014

    valve documentation

    Dear ALL, Good day, In our off-shore project, contractor offer gate valves rating 7.500 psi instead of our requirement which was API valves 10000psi. we accept that , My question could we ask for "stress limit calculation report" since the different of the rating effect stress of the valve...
  8. mustafa2014

    COMMISSIONING FOR FLOATING ROOF SEAL

    Dear all, Good day, I would to ask about the rim space > recently our maintenance team has installed a new seal for external floating roof, my question is that when they opening the fire water on a rim space, the water came in to the tank through the seal? is that accepted? if yes how...
  9. mustafa2014

    Needle valves vs ball valves in sub-sea control system

    Dear sirs, Good day, we are doing a sub-sea project. our company requirements in feed phase to use a needle valve in sub-sea control system.the contractor proposed ball instead of needle. My question is which better using needle valve or ball valve in sub-sea hydraulic system, what is the main...
  10. mustafa2014

    Needle valves vs ball valves in sub-sea control system

    Dear sirs, Good day, we are doing a sub-sea project. our company requirements in feed phase to use a needle valve in sub-sea control system.the contractor proposed ball instead of needle. My question is which better using needle valve or ball valve in sub-sea hydraulic system, what is the main...
  11. mustafa2014

    breakout torque vs operating torque for sub sea ball valves

    Dear all, Good day i have recived a datasheet for ball valve 20" rating 1500 from our vendor. The data were as following:- Nominal operating torque: 2200 Nm. Maximum operating torque: 2700 Nm. What make me quit strange is that, i found in their general assembly DWG that the breakout torque...
  12. mustafa2014

    API 6A (pressure rating design)

    Dear all, good day, i am working now in a subsea project our requirement were gate valves 2 & 4" gate valves with pressure class rating 10000 psi as per ISO 10423. Our vender proposed valves as per API 6A with expectations on pressure rating which is 7500ps. THE API 6A is not stated in API 6A ...
  13. mustafa2014

    API 6A (pressure rating design)

    Dear all, good day, i am working now in a subsea project our requirement were gate valves 2 & 4" gate valves with pressure class rating 10000 psi as per ISO 10423. Our vender proposed valves as per API 6A with expectations on pressure rating which is 7500ps. THE API 6A is not stated in API...
  14. mustafa2014

    Thermal study for centrifugal compressor

    Dear All, Could any one explain to me "what is the thermal study for centrifugal compressor? And who should do this study Vendor Or the end user? what is the function of this study? Thank you very much for your support in advance.
  15. mustafa2014

    Overhung OH Amine pump

    dear Artisi, THank you very much for your reply.Please check the replies. 2- accurately measured head. 3-voltrx"(vortex) plate": is a vertical plate on the suction of the pump it seems like to break the flow coming to the pump. 4- vibration analysis undertaken: the pump is too noisy. I will...
  16. mustafa2014

    Overhung OH Amine pump

    sorry please find attached the pump curve http://files.engineering.com/getfile.aspx?folder=88c32987-8b8f-43ea-ad95-ba1be4263047&file=027_41.pdf
  17. mustafa2014

    Overhung OH Amine pump

    dears all please find the attached pump data please your supporthttp://files.engineering.com/getfile.aspx?folder=c0b7cae6-b815-492f-8c00-94268e9abaf4&file=pump_data.pdf
  18. mustafa2014

    Overhung OH Amine pump

    thanx artisi for your reply i will provide all the data . I think the selection is wrong because the flow is too much for a single stage pump
  19. mustafa2014

    Overhung OH Amine pump

    Dear all good day, I have a question regarding Amine pump, it is Overhung Single Stage Pumps. they have problem with bearing , the voltrx plate in suction port of the pump always broken & problems with vibrations. I think because of a high flow it is : Q=1350 M3/H H=70M. I think the...
  20. mustafa2014

    steam turbine went on fire

    Dear All,Good day, here we are in a gas plant 10 years old.WE have three steam turbine (22MKW), each one of these turbines is in the canopy (enclosure)there is no any fire protection in side the canopy. Recently one of them is went in fire and almost damaged every thing. In my opinion the HAZOP...