Dear everyone,
I have a query regarding the bending moments in slabs after adding secondary beams.
As per the conventional approach, the bending moments in the slab near the secondary beam should be the hogging moment. But in ETABS, I am getting sagging moments near secondary beams which seem to...
Dear everyone,
I am getting huge torsional moments in beams due to earthquake forces in ETABS.
The slab diaphragm is rigid.
Can anyone describe how torsion is induced in beams due to the earthquake force? How is it calculated manually?
Dear everyone,
I am modelling a ten storied building with beams, columns and shear walls in ETABS. The building has core shear wall system. The beam connecting the core shear wall and column is failing in shear. The length of this beam is 2 meter. Increasing the size of beam causes the increase...
The base of slab cannot be extended more than 1.5 meter. This value is fixed as per site condition. The heel cannot be extended as this lies in other's property.
I have designed the pile considering the additional moment to stabilize against overturning by the tensile force multiplied by the...
My wall is 4.2 meter high and base 1.5 meter.
I am getting factor of safety against sliding of 0.85 and factor os safety against overturning as 0.6 which are very low. I want those safety factors to be more than 1.55
I am trying to use the pile to satisfy these conditions.
I have attached the...
Dear everyone,
I want to design a retaining wall supported on single pile.
Can anyone give me tips on how to design the wall and pile?
Is there any book for the reference?
Thanks for all the replies.
Most of the shear walls of vault are only at the ground floor. There is only two walls that go to the top. I think I will have to continue these walls to the raft.
These vault walls are the RC walls of thickness 450 mm. These walls are provided for security reasons as per client requirement. The problem is that these walls cannot be extended to the basement or raft foundation as it will disturb the parking area.
Dear JLNJ,
I also have the same doubt regarding the transfer of forces due to the discontinuity of shear walls.
As much of the forces in the basement are taken by the basement walls which run the along the periphery of the building, these vault shear walls carry less load when modelled to the...
Dear everyone,
I am modelling a building for banking purposes. It has vault at the ground floor and parking at basement.
The vault has shear wall which cannot be continued to the raft foundation as it disturbs parking area in the basement.
I cannot see the effect of this discontinuity in ETABS...
Dear everyone,
Can anyone clarify me the meanings of Mass X, Mass Y, XCCM, YCCM in the center of mass and rigidity table generated by ETABS?
Is there any manual where their meanings are written?https://files.engineering.com/getfile.aspx?folder=d8a91f83-dfdd-43a0-864e-b10d35383031&file=Capture.JPG
Hi everyone,
I am analyzing a 3 storied residential building with story height of 11 ft in ETABS. The number of bays in X direction is 3 with maximum span of 12 ft and the number of bays in Y direction is 2 with maximum span of 14 ft.
I am getting huge story drift ratio (of around 0.008) which...
Dear everyone,
I have doubt regarding the design of column with shear wall. While modelling the building with shear wall, the columns attached to shear wall fails due to higher axial force and moment in the column. Increasing the size of column increases the force and thus fails again.
What are...
Thanks everyone for your answers.
I am using ETABS software for the analysis.
Please see the attached screenshot of the modal mass participation table.
Dear everyone,
I am modelling a five storied building with one basement. The basement walls are modelled at basement. The building also has vault rooms in the Ground Floor and the First Floor. So, I have to model the shear walls in Ground Floor and First Floor. I am getting low modal mass...
Dear everyone,
I am analysing RC building with 26 stories in ETABS. From its modal analysis, the time period of fundamental mode of the building is more than 5 seconds. Is it OK to get such a high time period?