IN PIPING ENGG. Varies doc.to be issued.
How to calculate Piping Man-hrs?
How much man-hours to be taken per line as Engg. Std?
If we have one project contains 200 lines (2" to 20") and we consider following activities.
1. From feed study to develop final studies
2. And upto final construction...
In PIPING ENGG. Varies doc.to be issued.
How to calculate Piping Man-hrs?
How much man-hours to be taken per line as Engg. Std?
If we have one project contains 200 lines (2" to 20") and we consider following activities.
1. From feed study to develop final studies
2. And upto final construction...