Hi,
A retail store of UK has a ground floor of 80,000sqft and 60,000 sqft is the first floor car park and rest 20,000sqft is the staff area in first floor.
As per NFPA ordinary hazard class 2, 52000sqft
is the maximum for a sprinkler operation.
So how many risers can come in this? And do we...
Hi,
A Department store of 5100 m2 total building area. Do this store require a sprinkler system and Hose inside.
If so In which hazard it will come? What should be the hose size/Class and what should be the gpm required for inside hose and duration hour if the system is pumped from a tank and...