Dear all,
We are operating Aluminum IFR with floating suction. We found the floating suction getting stuck at a particular height. Hence are draining the product. In the process one side IFR is stuck with floating suction arm and the other side has come down. We have observed this from tank...
Hi all,
As we have to do some maintenance work on the Surface of the Aluminum dome Roof. The Apex height of the dome is 68 m from the ground and the surface of the dome is very steep making it very difficult to climb. The only way to reach the upper surface is to use a lifeline rope (SS 10mm...
Hi all,
We are in the process of erecting a 75 meter aluminium dome roof. We are doing the ground assembly using Chain pulley blocks hanged in Tripods. As we move further to the periphery we find that, while lifting the structure using tripods the struts (beams) getting bent and even cracked at...