Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. PRESIDENTJ

    SHEAR WALL / DIAPHRAGM QUESTION

    I have a light-guage framed one-story building that has about a 17' eave height and a screw-down metal roof. The walls are type I shear walls with wood structural panels attached to the metal wall studs. One of the perimeter wall lengths is about 60' long but the total sum of the structural...
  2. PRESIDENTJ

    EXISTING BUILDING CODE QUESTION

    All, I have a project I am working with a client on. They want to turn an existing building (built apprx. 1915) into a restaurant. It is two stories, and we will be adding a kitchen, office, bathrooms, stairs, etc. downstairs and some bathrooms upstairs. It will also now be sprinkled where as it...
  3. PRESIDENTJ

    INTERPRETING "WORK AREA" IN IBC EX. BLDG CODE 2021

    Brian, thanks for the reply. A more significant level of structural modifications are required if the work area is > 50% according to the code. The "standard of care" is outlined according to which level is required. If work area is >50%, level 3 kicks in, which is quite more substantial than...
  4. PRESIDENTJ

    INTERPRETING "WORK AREA" IN IBC EX. BLDG CODE 2021

    All, I have a project I am working with a client on. They want to turn an existing building (built apprx. 1915) into a restaurant. It is two stories, and we will be adding a kitchen, office, bathrooms, stairs, etc. downstairs and some bathrooms upstairs. It will also now be sprinkled where as it...