Dear All,
Please asist regarding the LAPP ÖLFEX SERVO 2YSLCY-JB 3X95+16:
Is derating required for parallel cable installation? If yes,provide derating factor if two cables are installed in parallel?
Current carrying capacity (A)?\ for this cable...
Attached is the pump pereforamnce link of Tesk SVM(T)120-30 vertical Multistage Pump.
Assist in determining the the following:
1) maximum power on the power curve and flow rate at BEP
2) What is the correct forumala for BKW of pump