    Inspections on wrapping of a pipe line after a shut-down

    Thank you very much for the responses. The wrapping was done to the pipe due to low wall thickness and wrapped as per ASME PCC-2 allowance. The main concern is regarding the temperature cycle that the wrapping would experience which was not initially intended/designed for. LittleInch, I...
  2. Crude_Eng

    Inspections on wrapping of a pipe line after a shut-down

    Good day, I'd like to find out if anyone has experienced a similar situation and has some advice. There is a line on the plant that is currently wrapped. The wrapping was done on the run and at temperature. Initially, the line was meant to be replaced at the next shut down, but was then...