We are facing a costtly problem and advice is needed. In upstate NY, we have a level site, elevation 100', that has about 3' of miscellaneous fill consisting of boulders, rock, concrete pieces, and general soils. Underneath this stratum is a 2' stratum of dark, organic soil, top soil...