Hi everyone. I am modelling a proposed lake that receives about 2500 acres of runoff via a channel and have prepared a model in Beta 4.11 HMS with three subwatersheds, one reach to connect the runoff to a forebay, a forebay reservoir with overflow into a lake and the lake's outlet structure.
I...