  1. reed0519

    Anchor Bolt Spacing - Transmission Poles

    A vendor designed the anchor bolts for a pair of steel transmission poles with the AB (2.25") spacing at 6" center to center. I have another engineer telling me this spacing violates ACI-318 17.7.1 of min 4*da. ASCE 48-11 doesn't provide any guidance on this. I have seen several places where an...
  2. reed0519

    Site Grading/Stormwater Design - Intro

    I am looking to get into these fields, to bring additional services to the firm I work at (design pads for substations). Can anyone recommend training/courses/books that would be helpful for a newbie? Also, any industry standard manuals/procedures. Thanks!
  3. reed0519

    NESC 235E and Table 235-6

    I would like to get some clarification on whether to use phase-to-phase voltage or phase-to-ground voltage when calculating clearances described in Table 235-6 of the NESC Code. The table clearly states circuit phase-to-phase voltage in the column headers but the title references Rule 235A which...