  1. andrewleong

    Inspection Opening

    As per ASME VIII div 1, UG-46 : "All vessels 18 in. (450 mm) to 36 in. (900 mm), inclusive, I.D. shall have a manhole or at least two handholes or two plugged, threaded inspection openings of not less than NPS 2 (DN 50)." "(7) Flanged and/or threaded connections from which piping, instruments...
  2. andrewleong

    Stacked Shell & Tube Heat Exchangers

    Hi all, I have a query regarding stacked shell & tube heat exchangers. I have 2 nos shell & tube heat exchanger for different services (with different design conditions) with below details: exchanger 1 : 1200 (ID) x 6300 (tube length) exchanger 2 : 1050 (ID) x 6000 (tube length) since they...
  3. andrewleong

    Stress Relief of Flush-Type Clean Out Fitting

    Does a stainless steel flush-type clean out fitting requires thermal stress relief? According to clause 5.7.4.1, all flush-type clean out fitting require thermal stress relief. While Appendix D section 3.7 - 650-I-33/99 also states that stress relief is required regardless of the material...