What should be the correct way to ground a PLC Panel? Is it necessary to instal an isolation transformer for the grounding of the PLC panel?
Or can we bring a ground conductor (isolated ground) directly from the 120V distribution Panel and connect it to the ground bus of the PLC panle; and then...
Should we use HP or BHP for the calculation of loads? For example a 20HP load has a BHP=18. We have to size transformer for eight 20HP motors.
If we take HP of motors then: 8*20*0.746 = 119.36 kVA (150kVA transformer required)
But if we take BHP of motors, then: 8*18*0.746 = 107.42 kVA...