I'm laying out the installation of some new equipment on an existing slab and plan to use Hilti HY 150 max adhesive anchoring system. I'm using a 1/2" threaded rod (HILTI HAS E-Rod)with an embedment depth of nine inches. I'm using HILTI's design charts and formulas and checking that it...
My company is installing a new boiler on an existing slab where the old boiler was installed. I have been looking for examples of how to design an equipment pad that will be installed on an existing slab. I have searched my text books, the ACI and online sources but all I'm finding is elevated...