Dear All,
i designed a pile which dia is 20", length = 50'-0".
but the problem is when site engineer is doing construction caving occurs.
he told me caving length is almost 5'-0". they use 11 bags cement instead of 18.5 bags.
what should i do now? cancel it and design another pile??
Faisal
Dear All,
i got from a manual that if Pu/Po < 0.35f'c x Ag then wall detailing is necessary. but if Pu/Po > 0.35f'c x Ag then wall can be detailed as column. i checked this equation in UBC Code and ACI code but did not get any information about this equation. can i follow this equation for...
Dear All,
i use ETABS to do analysis of RCC building. sometimes i get that rebar percentage of column bottom portion is lower than the top portion of that column. for example today i have got at bottom portion (Ground floor) rebar percentage is 1.2% but in the top portion (10th floor) rebar...
Dear All,
i have to design a swimming pool on the top floor of a residential building. bottom slab of pool is 4'-0" above the floor slab. pool size is 33'-8" x 12'-1" having variable depth 3'-0" to 6'-0".
i want to know that what will the pool bottom slab thickness and what will be the...
Dear All,
is there any problem of designing two way slab having thickness 8 inches though other adjacent slab thickness are 6" and 5"?
what kind of consideration i will take while performing the slab design?
Thank you.
Regards
Engr. Faisal
Dear all,
i just want to know is it possible to perform a design two way slab using flat plate which has two span only.i attached a file i can provide beam only to the stair portion but i cannot provide beam in other portion because of architectural requirements. please consider RCC Slab.
Thank...