In North Dakota the spec for earthwork requires that all soil be at or 5 percent over optimum moisture as determined by the 5 pt proctor. Also must meet 90 percent of the maximum dry density. Is this a bogus spec? The contractor is able to meet density even when the material is 1-2 percent under...