Hi,
I am assisting in the design of an earth grid that spans quite some distance ~400m x ~800m.
An issue that I have encountered is the reliance on equipotential bonds to provide earthing on long conveyor runs up to 300-400m as opposed to physically placing a principal earth in the ground and...