  1. hiluxxx03

    Soil Settlement

    I've got an instruction from our consultant that i don't understand the logic behind... based on the geotechnical report, we can excavate up to 1.5m from the natural grade level to achieve the needed soil bearing capacity but we must excavate 50cm more and backfill in two layers, 25cm per layer...
  2. hiluxxx03

    Foundation Works

    I've got an instruction from our consultant that i don't understand the logic behind... based on the geotechnical report, we can excavate up to 1.5m from the natural grade level to achieve the needed soil bearing capacity but we must excavate 50cm more and backfill in two layers, 25cm per layer...
  3. hiluxxx03

    Construction Method Statement and Risk Assessment Archive

    Thank you so much for all of you who responded very informatively to my previous thread... Does anyone have an archive of construction method statement and Risk Assessment because i would be preparing these paper works prior to commencing my construction work activities on site... Thanks in...
  4. hiluxxx03

    top and bottom reinforcement of footing

    i have a problem for my cutting list of the footing reinforcement... the footing is 2500mm x 3200mm x 600mm... the bottom reinforcement is 16mm @ 200mm o.c. bothways while the top reinforcement is 10mm @ 200m o.c. bothways... if i bend 90degrees and use e=12db, the top and bottom bars wont...