Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Kene1
  • Content: Threads
  • Order by date
  1. Kene1

    Catalogue For Waukesha Driven Compressors

    How do I get a catalogue (electronic) for the parts of a Waukesha driven compressors. I usually have some difficulty when ordering for parts to replace faulty one. Thanks
  2. Kene1

    Issue with Magneto

    The magneto we are using on our 12 cylinder Waukesha engine needs a voltage of 150-190 to enable the start-up. This mangeto was functioning properly until we had to shut down the compressor station for a period of 4 months. Now the voltage we are getting is 35V on the 12 cylinders which is not...
  3. Kene1

    Manual on Waukesha Gas Engine

    Please can someone provide a manual on Waukesha engine as we are carrying out troubleshooting activity on an engine that failed to start. Thanks for the support VHP 5108/5790/7042 G/GSI/GL Engines
  4. Kene1

    Low Voltage on Magneto

    The magneto we are using on our 12 cylinder Waukesha engine needs a voltage of 150-190 to enable the start-up. This mangeto was functioning properly until we had to shut down the compressor station for a period of 4 months. Now the voltage we are getting is 35V which is not adequate to cause...
  5. Kene1

    Nitrogen Preservation on Pig Receiver

    We are carrying out Nitrogen preservation on a pig receiver at a pressure of 0.5 bar as specified in the procedure. A leak test carried out on this facility at 15 bar could not detect any leak but yet yet we kept on experiencing drop in pressure (15 to 6 bar in a week). I will appreciate advice...
  6. Kene1

    Standard for Pressure Gauge

    We have completed the Nitrogen preservation of a 10'' 16Km pipeline in a swamp location at a pressure of 0.6bar. I have requested for the installation of 0-2bar pressure gauge for the monitoring of pressure over a period of 3 years before the pipeline will be used. The contractor supplied a...
  7. Kene1

    Bore Restriction on Pipeline

    We have completed laying a 12'' pipeline in swamp location and pre-commissioning activity is in progress. A caliper pig was launched on the pipeline after the gauge pig was observed to be badly distorted. The caliper pig showed bore restriction in 5 different locations and the contractor...
  8. Kene1

    Isolation Joint failed Resistance Test

    We are planning to hydrotest a 6'' SS pipeline for a gas service at a pressure of 230 bar but realised that the isolation joint failed a resistance test. This will definitely have to be replaced though it will take a long time to import. Please can some help with a solution as the company will...

Part and Inventory Search