hello everybody. I need help with some basics about coming up with the cable schedule for a typical 33/11kV primary substation.I've been assigned to supervise a substation construction project and i'm finding some difficulty following what is been done,especially on the control wiring. I asked...
hi everybody,I'm new to this forum.
I am an electrical engineer with a transmission and distribution company. we are currently constructing a 33 kV OHL. Our problem is with the angles on the towers.
By the manufacturers specifications,angles up to 10degrees should be considered as light angles...