  1. AlbertAllotey

    Primary substation control cable schedule

    hello everybody. I need help with some basics about coming up with the cable schedule for a typical 33/11kV primary substation.I've been assigned to supervise a substation construction project and i'm finding some difficulty following what is been done,especially on the control wiring. I asked...
  2. AlbertAllotey

    Overhead line transmission tower angle problem

    hi everybody,I'm new to this forum. I am an electrical engineer with a transmission and distribution company. we are currently constructing a 33 kV OHL. Our problem is with the angles on the towers. By the manufacturers specifications,angles up to 10degrees should be considered as light angles...