For your consideration and input. I am performing an evaluation for a dam which utilizes a concrete gravity spillway structure with monoliths placed on firm bedrock. The right embankment has an impervious core with adequate transitioning zones into rolled rockfill, adjacent to the impervious...
For your consideration and input. I am performing an evaluation for a dam which utilizes a concrete gravity spillway structure with monoliths placed on firm bedrock, an installed double line grout curtain to control seepage and relief drains to collect the seepage that passes through the grout...