Hi Engineers,
I would like to know how we determine the pipe penetration type (between doubler and sleeve) on bulkhead penetration
when should we use doubler or sleeve? is there any factor such as pipe pressure or plate thickness that affect the determination? please somebody help.
many thanks,
Hi everybody, I am doing cargo system calculation for 2 different type of Oil-based mud, base oil & brine, I am just informed about its SG such as the following:
- type 1 Oil-based mud SG 1.5
- type 2 oil-based mud SG 1
- base oil SG 0.78
- brine SG 1.49
I need the information about its...