I have a 7000 sg ft office building with a 20 ton cooling, 360 MBH heating RTU. RTU has an economizer and it is bringing in 1,635 cfm for O/A. Air distribution is to a VVT system. After a week of data logging recordings average a temp of 72F and an RH of 24%. Location is southern ohio and the...
I have a very interesting case concerning a 2 pipe system. The owner wants to transition from heating in the morning (boilers heating the supply water up to 120F) to coiling in the afternoon (chillers supplying 45F water). With this being a 2 pipe system I need to dump all the BTU's in the water...
I am an intern and have a project that I'm supposed to go look at. I would like to get some help on here first that way I don't sound like a dumb a$$ when I talk to my boss haha. The information I have is very limited and it is as follows.
they want to cool the oil from 180F to 60F in 2 hours...