Hi,
My design requires 2.75x2.75x0.75m bases. Fractured rock starts at 1.3m progressing to more solid rock so I don't really want to go past 1.5m to keep costs down. The client has a very tight budget.
The 2.75x2.75x0.75m size is only due to uplift. So what I'm asking: Is there a construction...