Hi all,
I am looking for information on pipeline construction and operations life cycle costs. I have heard about a ratio of around 15% for construction and 85% for operations over a 30 year span. I understand that this ratio could vary depending on pipes, product, etc.
Has anyone got any...
Hi all,
Is it recommended to run a batch of corrosion inhibitor (oil-based for instance) after hydrostatically testing a pipeline with a water/methanol mixture in case the pipeline commissioning is delayed or a pipeline drying may be sufficient to get rid of the water/methanol mixture?
Thank...
Hi all,
Is it recommended to run a batch of corrosion inhibitor (oil-based for instance) after hydrostatically testing a pipeline with a water/methanol mixture in case the pipeline commissioning is delayed or a pipeline drying may be sufficient to get rid of the water/methanol mixture?
Thank...