Dear
Please elaborate "Difference between Battery discharge period and Discharge rate"
my understanding is like this that the battery discharge period/ duty cycle is the requirement by a company while the discharge period is the manufacturer rating of the battery without reaching its cutoff...
If the area is not sufficient to lay more conductor then
Can we consider terminal tower compound area near the substation area in the design by connecting the Mesh of substation with the mesh of Tower compound mesh through a reasonable size of conductor?
Hello
I am handling the design of a substation limit whose grounding design is with with very high GPR, while Step and touch are within limits. The normal practice is to use conductor and rods.
What possible method is to bring GPR close to the acceptable limit.
Can I use remote contribution less...