Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: ThorenO
  • Content: Threads
  • Order by date
  1. ThorenO

    Concrete Structure with Steel Roof / Joist Girder to RC Column

    2-story bldg, where 1st and 2nd floor occupancy requires concrete and steel roof is preferred by the client. Building will have interior elevator/stair and exterior RC shear walls. What are the some of the pitfalls to look out for or suggestions to permit a steel roof with concrete columns...
  2. ThorenO

    Topping for Existing 6.5" Slab-on-Grade

    Hello everyone, I've got an existing 6.5" interior slab on grade that I would like to add a 4" topping get additional capacity for heavy wheel loading. What are some of the general considerations to get increased capacity in terms of mix, reinforcement, surface preparation, dowels, etc...
  3. ThorenO

    Lateral bracing - light-guage partition walls

    Hello, I've got a network of intersecting 9' offices of varying sizes that I am trying to brace above the ceiling for the interior 5psf loading. See attached. Hatched walls are full-ht to the deck at ~30'. Here is what I'm working with in lieu of diagonal bracing. Detail 1: Horizontal "top...
  4. ThorenO

    Interior Masonry Wall Bracing in PEMB

    Hello, I have a partial height (15') masonry wall that I am kicking/bracing perpendicular to a Z-Purlin(s) in a low-seismic region. In order to keep the roof deflection / or any expansions from producing a force at the top of the wall, does anyone have any ideas for a medium-duty connection...
  5. ThorenO

    Reinforce 1.5B deck c.1980

    Hello, I wanted to see if anyone had input for reinforcing a 1.5B deck spanning 10' (from above ONLY). The supports are W10s @10' c/c spanning 20'. It would have been great to place an intermediate W10 to cut the deck span down to 5' for the deck, but all the work has to be completed from...
  6. ThorenO

    ASCE 7-10 Open Buildings - Wind Loading / Free Roofs

    Hello all, I have a typical gas-station type canopy with a 15 degree gable roof. Matches up well with Figure 27.4-5 except there is a soffit/ceiling (not accounted for in the diagram). I am trying to determine the additional loading that this ceiling should receive. While it's still an Open...
  7. ThorenO

    Large Diameter Anchor Rods with Corrosion Resistance

    Hello, I'm working on a sign structure near the ocean and wanted to see what type and specification of anchor rods would be recommended in the 2" diameter range. Will the #18J A615-75 galvanized work in this environment or is there a stainless steel option at that diameter that would be...
  8. ThorenO

    Pre-Engineered Metal Building - general considerations for openings

    Hello, thank you for any feedback in advance. Existing PEMB Description 360' wide (6-span frames) x 300' long (12) bays Eave at 23', Ridge @ 33' 1" dia. X-bracing with hillside anchors. Bracing located at (4) of the (12) bays on each end wall. Probable that (1) or more were removed. 8"...
  9. ThorenO

    (3) 2x8 Wood Beam Connection at HSS4x4 Column

    Hello, I could use suggestions for face-mount connection details for 3-ply 2x8s w & w/o 1/2" plywood fillers to an HSS4x4x3/8 column, say at mid-height and at the top. Needs light gravity and out of plane capacity. Thank you,

Part and Inventory Search