  1. judeotuks

    PIGGYBACKED PIPELINE ON-BOTTOM STABILITY ANALYSIS

    Hello, I am thinking of the best approach on carrying out on-bottom stability of a 4-inch gas lift line being piggybacked by a 12-inch main pipeline: -Analyzing just the stability of the 12-inch main line (ignoring the piggybacked line) or - calculating the equv. WT of both lines , then using...
  2. judeotuks

    PIGGYBACKED PIPELINE ON-BOTTOM STABILITY ANALYSIS

    Hello, I am thinking of the best approach on carrying out on-bottom stability of a 4-inch gas lift line being piggybacked by a 12-inch main pipeline: -Analyzing just the stability of the 12-inch main line (ignoring the piggybacked line) or - calculating the equv. WT of both lines , then using...
  3. judeotuks

    API 5L 44th and 45th EDITION COMPARISON

    Hello Everyone, I have not actually gotten my hands on the latest API 5L Specification for Line Pipe, 5th Edition and was wondering if anyone has done a detailed comparison between these two revisions (44th and 45th). Please it will be so much appreciated.
  4. judeotuks

    AGA LEVEL 2 - CONTRADICTORY EFFECT OF HYDRODYNAMIC FORCE ON PIPELINE STABILITY

    Hello, I am currently making some sensitivity runs on-bottom stability using AGA level 2 for a subsea pipeline , at 20 meter water depth. However , I am getting a strange result which I can’t explain: Taking a typical Case; Current dominant case, with Spectral Peak Period (Tp) = 13.6s...
  5. judeotuks

    PRCI-AGA PIPELINE ON-BOTTOM STABILITY ISSUE

    Hello, I am currently making some sensitivity runs on-bottom stability using AGA level 2 for a subsea pipeline , at 20 meter water depth.   However , I am getting a strange result which I can’t explain:   Taking a typical Case;   Current dominant case, with Spectral Peak Period (Tp) = 13.6s...
  6. judeotuks

    Shore Approach Pipeline design (stability analysis)

    I am carrying our a shore approach design for a 20in gas line. The pipeline will be trenched and backfilled (1 m cover) with sand. Please I am looking for calculation methods/go-by for assessing the stability of the pipeline/backfill against hydrodynamic forces.
  7. judeotuks

    Axial Break-out, Residual and Remolded Resistance Used For Thermal Expansion Analysis

    I have just calculated axial friction factor of a pipeline laid on a soft clay based on three parameters; breakout friction, residual friction and remolded friction...Residual friction gave me lowest value while breakout gave me the highest value (Ref OTC 19589 PSI during lateral Buckling and...
  8. judeotuks

    DESIGN/OPERATING TEMP FOR EXPANSION ANALYSIS

    Hi I am currently working on thermal expansion analysis based on Palmer and Ling theory for a 75km offshore pipeline. I want to know if its the DESIGN OR OPERATING TEMPERATURE PROFILE I should use for my calculations, because my PROCESS team supplied me with just the operation temp profile...
  9. judeotuks

    Linear Interpolation Using MathCAD

    I need help writing the statement below on mathCAD C1= 0.2 when beta is less than or equal to 0.9 C1= -0.2 when beta is equal to 1.0 linearly interpolating values between b=0.9 and b=1.0 ( please refer to the attached for further clarification) Thanks
  10. judeotuks

    Structural Modification of Offshore Platform Checklist (An Ideal Site Visit Verification)

    I will be going for a site visit of an existing offshore platform which is to be linked to another platform (proposed) via a bridge connection. Please does anyone have a typical verification checklist from a structural point of view?
  11. judeotuks

    Structural Modification of Offshore Platform Checklist (An Ideal Site Visit Verification Checklist)

    I will be going for a site visit of an existing offshore platform which is to be linked to another platform (proposed) via a bridge connection. Please does anyone have a typical verification checklist from a structural point of view?