  1. EloyRD

    Siphon for connecting two reservoir

    Hi, I'd like some opinions about guaranteeing easiness of operation of a siphon connecting two ponds. The installation is at sea level for irrigation, the configuration is: - there is an existing pond of 600,000-cubic-meters of water capacity and 8-meters of water depth. This existing pond...
  2. EloyRD

    Chiller Structural Foundation

    Hi, everyone. I'm looking into the requirements that I should make to the structural engineer for the installation of a magnetic chiller in a roof. After looking into thread507-299291 I'm understanding that if he provides a 6'' maintenance slab and I specify that the equipment is provided with...
  3. EloyRD

    Fire protection of an airport terminal building

    Good day, community: I'm part of a team that is designing a fire-protection system for an airport terminal building. Other parts of the fire-protection system (like hangars and maintenance workshops) are being taken care of by an independent system. We are having issues in defining if it is...
  4. EloyRD

    Ventilation to prevent high temperature in chiller plant in basement

    Good evening, community: I'm reviewing the HVAC design of a chiller plant in the basement of a 30-floor building. The main equipment present in this room are: - Chiller / 360 ton / 351 kW (x3 units) - Primary loop pump / 1512 GPM @ 60 ft w.c. / 30HP (x4 units) - Secondary loop pump / 2268 GPM...
  5. EloyRD

    Heating and Thermal Insulation for a NaSH Storage Tank

    Good afternoon Comunity, I'm designing a storage tank for Sodium Hydrosulfide (NaHS) 45% solution for a Mine in Peru. Due to the required storage temperature (as pointed in http://www.genesisenergy.com/assets/_RefineryServices/Technical_Guide/Technical_Guide_10_31_11zip.pdf) and the site...
  6. EloyRD

    Convective Coefficient Heating and Thermal Insulation

    Good afternoon Comunity, I'm designing a storage tank for Sodium Hydrosulfide (NaHS) 45% solution for a Mine in Peru. Due to the required storage temperature (as pointed in http://www.genesisenergy.com/assets/_RefineryServices/Technical_Guide/Technical_Guide_10_31_11zip.pdf) and the site...
  7. EloyRD

    Confused with Pipe Specification from Korea

    Dear community, Recently I received a BOM for a Power Plant designed in South Korea. I have an issue with items described as "ASTM A106-B CS SMLS PE XS/80 (PE.C)" or "ASTM A106-B CS SMLS BE XS/80 (PE.C)", I have never used the (PE.C) descriptor and I am ignorant of its meaning. I've tried...
  8. EloyRD

    Variable Primary Flow CHW and chiller interaction

    Dear community, I'm in doubt in the following aspect of a Primary Variable Flow CHW system : The minimum flow of CHW through the chiller is provided by the lowest speed of the pump. Also, the chiller has a minimum load protection. My doubt is if below the minimum cooling load the chiller...
  9. EloyRD

    Buckling of Tank Roof Columns

    Hello, comunity: I'm in the middle of the calculations of the columns that support a Cone Roof. I'm having problems deciding for the k factor to compute the slenderness ratio: - I visualize the contact area of the roof as a FREE boundary condition. - I can't decide if the connection with the...
  10. EloyRD

    ASME B31.4 - Mitered Bends out of spec

    Dear comunity: I'm dealing with the task of justifying the use of mitered bends that were field constructed without consideration for what is established in ASME B31.4-2009 404.2.4. The pipeline starts with a manifold connected to 4 Vertical Centrifugal Pumps each one rated to 585m3/h @ TDH...
  11. EloyRD

    Analisis of downhill pipeline

    Dear community, I'll appreciate your oppinions in how a downhill gravity pipeline is being analyzed. The pipeline has changes of internal diameter and slope, altough it always is going downhill. The pipeline starts in a tank and discharges to a pond and has a flow requirement. 1) We analyzed...