Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: WvPetegem
  • Content: Threads
  • Order by date
  1. WvPetegem

    Sleeve transition fit --> effect on ID tolerance

    Hello, I am having difficulties selecting the correct tolerances for a sleeve (stationary bush) which will be fitted (with a H7/m6 transition fit). Attached the situation sketch. Some fixed figures: Hub outer diameter: 700 mm Hub inner diameter: 356 H7 Sleeve outer diameter: 356 m6 Bush outer...
  2. WvPetegem

    Y/? start elecitrcal motor wiring

    Dear all, I hope you can help me out with following question related to the wiring of a 3-phase electrical motor with a Y/Δ starter. Originally I have a ABB motor (M2AA type) which is when switched in delta: V2 switched to U1 (via phase L1) W2 switched to V1 (via phase L2) U2 switched to W1...
  3. WvPetegem

    Standard overhaul specifications

    Hello everyone, I was wondering if anybody knows a leaflet/book/document wherein a number of standardized overhaul-works are specified. I can imagine that a lot of overhaul works (like for E-motors, hydraulic pumps, propeller/rudder arrangements, piping etc etc) described/specified in a...
  4. WvPetegem

    Scope of Work for overhaul E-motor

    Hello everyone. I was wondering if somebody could advise me what the 'standard' scope of work is for an overhaul of an 3-phase 400V E-motor (like type 225M). Renewal of bearings and cleaning of the coils are obvious; but should works like 'rewinding of stator/rotor coils' also be advisable? And...

Part and Inventory Search