Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: nabilbasha
  • Content: Threads
  • Order by date
  1. nabilbasha

    bypass decoupler pipe in primary/secondary chilled water system

    Hi everybody, In the attached typical primary / secondary chilled water system, you will notice that there are two (2) bypass pipes. This is the first time I come across such arrangement. i.e. 2 bypass. Also the location is wrong. In addition, having visited the job site, one of the bypass has...
  2. nabilbasha

    how to calculate loads for selecting vibration spring mounts on pump inertia base

    For the purpose of selecting the correct vibration spring isolator weight ratings on a 75hp end suction centrifugal water pump, someone told me I should it the sum of: concrete base + pump & motor assembly weight + valves & fittings weight up to first support/hanger + hydraulic weight. he...

Part and Inventory Search