Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SDETERS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: sb79
  • Content: Threads
  • Order by date
  1. sb79

    Spacing between existing and new reinforcement

    I am working replacing an old silo is replaced with a higher one (68' old and 100' new) but same diameter. At door the old silo had #4 dowels @ 3" o/c. My question is if the old bar are cut (at top of foundation) and new dowel bars are to be placed (w/ Epoxy) in the foundation, the spacing...
  2. sb79

    Embedment of timber pile into pile cap

    Hello Everyone I am designing a pile cap (70' dia. and 2' deep) with timber pile type B (capacity 40 kips/pile) for a tank with total load of 10000 kips. I am using total of 261 piles as per arrangement. What should be the embedment depth (inches) of timber pile into pile cap. Thank you in...
  3. sb79

    Calculation of Negative Moment

    Can someone help me in calculating the negative moment (or moment at support) I am designing a pedestal with a circular slab of diameter 50 feet supported on a circular wall of 8" thick and 38 feet outer diameter. The thickness of the slab is 27" Loads: Self Wt of Slab = (150 lb/ft^3)*...
  4. sb79

    Circular Slab

    Hello I am designing a pedestal with a circular slab of diameter 50 feet supported on a circular wall of 8" thick and 38 feet outer diameter. The thickness of the slab is 28" (governed by shear design) I am looking for a good example for two-way reinforcement detail. Can someone give me any...
  5. sb79

    Clear Span as specified in SDI

    When it says clear span on SDI (Steel Deck Institute), does it mean from center line (web to web) or flange tip to flange tip. Thanks in advance.

Part and Inventory Search