Hello All,
I have been tasked with doing structural analyses of overhead lifting slings. They are for lifting ~10,000 Lbs in a factory setting.
I've been "told" that the requirement is SF = 5.0 for the entire assembly: I-beams, lugs, bolts, bearings, wires, welds... every little detail...