Hi,
I working on demolition of a school building in NYC area. We are structural consultants working along with architect. I am not sure on how the submission of drawing works for this kinda job. Btw we submit our drawings to NYC parks and recreation department. Our job scope is essentially to...
Hi,
I working on demolition of a school building in NYC area. We are structural consultants working along with architect. I am not sure on how the submission of drawing works for this kinda job. Btw we submit our drawings to NYC parks and recreation department. Our job scope is essentially to...
I am new to doing peer review on tower cranes. The tower crane stands 260ft tall with a massive foundation. I see the designer has used crane dead load & weight of crane footing in arriving at reactions and overturning moment. In my opinion wind loads should be included to obtain base reactions...
Hi,
I want to design an aluminum base plate for aluminum column of size 4"x4". Can i use the anchor rods specified in the AISC manual for steel, will that be sufficient?.
The base plate is supposed to be on a concrete footing, so what measures should i take in order to avoid/prevent...