REQUEST FEEDBACK IF THE ATTACHED ARRANGEMENT OF VALVES PACKAGE AND HOSE REELS IS IN COMPLIANCE WITH NFPA. THANKShttp://files.engineering.com/getfile.aspx?folder=772dec60-3a7a-49a9-863a-b1c4bd741599&file=TYPICAL_FLOOR_LAYOUT.jpg
I am searching for design estimate of daily water consumption by outpatients in health care facilities. The only data I found was about Guidelines for minimum emergency water quantity for outpatients which is 5 liters/out-patient.
I would appreciate any data about regular daily water consumption...
We routinely flush new chilled water pipe networks by bypassing all the equipment such as chillers, FCUs, etc, then do the removal of rust and finally introduce corrosion inhibiting chemicals in preparation of commissioning the system. I would like to know the procedures for flushing and...
i want to know how to flush the new steam pipe network. Is it flushed by steam or by water and how about the condensate portion of the piping. Is it flushed by gravity or under pressure? Where can I find detailed guidelines of how to flush our welded black steel pipes of the steam network all...
The Sequence of Operation of the chilled water system pumps (depicted in the attached sketch) is that when there is demand for cooling, the Primary Pump comes on. Upon proof of flow from the flow switch, the chiller associated with this primary pump comes into operation. If the cooling demand is...
The chilled water system consists of 3 chillers and 3 primary pumps (200 gpm capacity). Each building has its set of continuous duty secondary pumps.
According to the existing Sequence of Operation, if there is demand for cooling, the Primary Pump comes on. Upon proof of flow from the flow...