i`m trying to get the time hystory function for ETABS input.
However i`m having a trouble how to get it from NGA WEST site.
i just don`t understand how to get the function to etabs file.
Would you guys helping me?
best regards
Hello,
I`ve a 10 storey building with 1 + 1/2 basement ( i called that because the top basement just half embeded).
the total embeded height is about 4.5 meter.
i used prestressed driven piles for tower foundation, i`m also put some bored piles in foundation slabs to restrain flood load (some...
Hi there,
I`m actually a structural engineering, trying to understand how to get a proper model of 10 storey building on analyzing settlement.
i`m use pile caps and tie beams as the foundation, the top of pile caps is just the same as the foundation slabs.
i`m getting confuse about the proper...
Hello,
I`ve got a project that only allow me to put some shear walls in one direction (say Y direction).
My intension is to design the building as dual system in Y direction, but special moment frame in X direction, despite some girders connected to shearwall`s weak axis. Is that legit to...
i just install my etabs version 9.74 but when i open it, some text don`t fit in the message box so i cant see it clearly.
so anybody know how to fix it?
i can`t see the option because the text is merged by the box