Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: faiswish
  • Content: Threads
  • Order by date
  1. faiswish

    Arc Strike on pressure vessel

    Hi brilliant guys, Requires your help to sought out the problem, Welder has accendantly touched the heat treated vessel by air arc gouging of SA-517-F quenched and tempered steel and the gouged is deep about 10th of the base metal thickness. What would be the repair procedure, should I just...
  2. faiswish

    U stamp vs ASME stamp

    Hi all, I have seen UHT pressure vessel built in 2004 has U stamp on data plate and we are constructing new UHT vessel with ASME stamp on data plate what is the deffrance between U and ASME stamp? Thank you!
  3. faiswish

    SA517B P11B PWHT soak time exceed

    Hi Frends, we have new constructed pressure vessel made out of SA-517B which is P11B Group 4 shell thickness 0.370" after vessel been fabricated sent out for stress relieving as per engineers issued PWHT instruction sheet heating time suppose to be 350F/hr and soak time 30 minute at 1050-1100F...
  4. faiswish

    National Board transport vessel NH3 MC330

    Hi every body, i have vessel for internal weld repair it has National Board stamp on it NB 2190 built in 1962 head and shall material 1204-9 no S/N no TCRN number my question is according to the new ASME sec Viii Div 1 what would be the equalization material for repair. Regards

Part and Inventory Search