Hi there,
I have problem at my instrumentation wiring from field to marshaling cabinets.
because of some trouble at detailed engineering, we should mix instruments that role as PCS and ESD to one JB with two multicable out. (of course it is out of client spec)
data i got are:
1. all...
Guys,
I have a problem with my rich glycol exchanger drain line. I have this vessel already stand above platform, and the space length from bottom flange (for drain) to floor is only 49mm. My piping engineer suggested to configure the bottom drain to be:
1. SS Blind ½ 150# with drill hole ½...