Is it normal for a welding code to allow production welding to start BEFORE a PQR is run? Once the procedure is qualified then it covers the welds already welded, is that a normal provision in a code for PQR & WPS's? It is in AS/NZS 1554.1 - 2014 with no time limit on how long you can run...
Are you permitted to write a welder qual for yourself in AS/NZS 1554.1:2014?
And if so is this bad?
I started a thread on AS/NZS 1554.1 and have been locked out of it twice and it's sub-section once despite, as far as I can see, complying with the rules. So I've had to shift to here. Maybe...
Training required.
Would be interested to understand what people think of the variable as described in Table 4.11A item (m) in AS/NZS 1554.1:2014.
Preheat is determined as per clause 5.3, but is allowed to drop another 20 Deg C according to this variable, seems strange the 20 Deg C isn't...
thread809-354393
A quick follow up on this in case anybody else struggled with this, I think it is safe to say the check in 4.7.4 is not a flange alignment check at all. It is a check of how well the spring supports match the piping. This is done before any detailed piping to machine alignment...
Morning Gents,
I’m new here so take it easy...
I’ve been putting together an ITP for Flange Bolting using ASME PCC-1 as a guide but I am getting a little confused where it refers to API 686 Part 6, 4.6 through 4.9 for alignment of flanges connected to sensitive or rotating equipment when...