After the typhoon stress test some weak spots became apparent.
One of them is the second floor open terrace. The terrace is around 4x4 meters, on two sides walls and two sides open so one corner column, then high wall like 1m+ parapet which was made like that for safety because of children. On...
The picture shows the building under construction, it was November 2011.
October, 2012 there was no noticeable cracks.
October 2013 there is significant random patch work and cracking of hollow block segments.
But one column on the opposite side there is a column with different kind of...