Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. sailoday280

    Replacement Commercial Air Conditioners

    We are replacing a roof top Air Conditioner. The 12 story high rise bldg is 35 yrs old and was designed to have pressurized corridors/hallways. Presently, due to age, etc, the bldg is not pressurized. The engr wrote a spec for the replacement AC. He use desig conditions of inlet air to...
  2. sailoday280

    Low Refrigerant

    Can someone provide the theoretical and practical reasons that low refrigerant will cause icing on the outside of the evaporator? Thanks
  3. sailoday280

    Two speed AC compressor

    We are replacing a split AC system (25 yrs old) for the lobby of our condominium bldg. Capacity is approx. 7.5 tons. I asked the hired engineer to consider a 2 speed AC motor or 2 stage compressor in his specification so that we could then evaluate the higher initial cost vs long term savings...
  4. sailoday280

    USE OF EXISTING PIPING WHEN CHANGING OUT AIR CONDITIONER AND AIR HANDLING UNIT

    Presently the lobby of our building is cooled by a 10 ton Air Conditioner --- the compressor and condenser are located about 150 ft from the bldg. An inside air handling unit with and evaporator is located in the bldg. Air conditioner compressor, evaporator, etc are about 30 yrs old and are to...

Part and Inventory Search