Hi,
API 609 related to Butterfly Valves is divided in 2 categories : A & B.
One of the piping classes on my project is giving me the choice between both, for all diameters, and there is no note saying when to use one or the other.
I'm guessing it is a matter of fluid.
Can someone explain to...
Hi,
I'm working on a gas project, for which I need to install an underground DN150 PE lined CS pipe.
I got a client standard imposing the use of concrete sleepers in the trench, around each fitting. Just before and after each elbow, just before and after each tee.
Nothing stating the use of...
Hi,
I need to install in a chemical plant a whole network of vent lines coming from the reactors and going to scrubbers and oxydizer.
Client requested to have these lines in FRP (Fiberglass).
Can someone tell me what is the installation cost of this kind of pipe.
I'm looking for an easy way...
Hi guys!
I've been working for 6 years now in the Oil&Gas/Pharma industry as a Piping Engineer.
I worked on 2 "oil" projects and 1 "bio-pharma" project, and now i've been assigned to a Cosmetics Project.
Most of the fluids in this project don't impose a high sanitary level of piping and...